i_id: (Dad)
[personal profile] i_id
This list is by no means complete, and will continue to evolve.

TO DO

I.   Cockpit
    A. Replace plexi hatches w/ wood
    B. Laminate new tiller - In Progress
    C. New cockpit deck hatch.
    D. Isolate cockpit lockers from cabin
    E. New washboards
    F. Build a rope locker in cockpit.

II.   Cabin
    A. Cabin table.
    B. Aft cabin bulkhead
    C. Pull out vinyl and fleece. - In Progress
           1. Vacuum out debris.
    D. Sand/chisel inner hull clean.
    E. Paint inner hull.*
    F. Clean out icebox.
    G. Choose favorite berth
    H. Build up opposite berth for storage/desk space
    I. Wash and air all mattresses.
    J. Replace or repair sliding cabinet doors.
    K. Move anchor locker aft.
    L. Build emergency locker.
   
III.  Water systems
    A. Clean and check sink fittings.
    B. Decide about salt water pump.
    C. Investige and clean or remove all water tanks.
    D. Trace icebox drain.
    E. Anchor locker drain.
    F. Pull out head.
    G. Investigate head sink.

IV.  Wiring
    A. Trace all wiring.
    B. Make diagrams.
    C. Repair/replace as needed.
    D. Decide what I'm doing with the 110 wiring.
    F. Replace shore-power coupling.

V.  Engine
    A. Study engine manual
    B. Rework engine cabinet.
    C. Get fuel tank out
    D. Remove engine from boat.
    E. New outboard support.
    F. Replace salt-water intake valve with one that can be shut off.

VI.  Propane
    A. Get propane tank tested.
    B. Study stove manual.
    C. Does stove work?
    D. Look for an oven. 18"x18"x15"

VII.  Paint
    A. Bottom paint.
    B. Shear stripe. (blue? With accents?)
    C. Transom (name)

VIII. Mast & Rigging & Sails
    A. Sort out shrouds and stays. Are all pieces present?
    B. Remove 'ratlines.' - in progress
    C. New chain plates.
    D. Beef up mast support.
    E. Step mast.
    F. Scrub boom 6/4/12
    G. Scrub mast (get wasp nests out)
    H. Strip sheathing off shrouds.
    I. Re-run all new running rigging.
    J. Extra main track.
    K. Baby stay to foredeck.
    L. Test sails.
    M. New sailbags and main cover.
    N. Set up rigging so mast can be raised/lowered from deck.

IX. Deck
    A. New bow pulpit.
    B. Granny bars.
    C. Clip line.
    D. Through-deck for anchor gear.
    E. Dinghy chocks.
    F. Scrub deck.
    G. Anchor roller.
    H. Scrub teak.
    I. Remove old safety lines.
    J. New safety lines.
    K. Beef up or replace stanchions.

X.  Other
    A. Find or build a 6' dinghy.
    B. Make dinghy unsinkable.
    C. Dodger.
    D. Registration #'s
    E. Inspection
    F. Insurance
    G. Get trailer. (6/12/11)
           1. Adjust trailer to fit boat.
    H. Bring boat home.
   
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

i_id: (Default)
Hats

April 2013

S M T W T F S
 123456
78910111213
14151617181920
21 222324252627
282930    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 29th, 2025 09:35 am
Powered by Dreamwidth Studios